Skip to content

Recognizing that the retirement of nonintermittent electric generation facilities, before facilities with equal or greater reliability attributes are available, is a threat to the reliability of the United States electric grid.

Energy

119-hres290 — Recognizing that the retirement of nonintermittent electric generation facilities, before facilities with equal or greater reliability attributes are available, is a threat to the reliability of the United States electric grid.. Sponsored by Rep. Fedorchak, Julie [R-ND-At Large]. Introduced 2025-04-02. House bill. 119th Congress. Latest action: Referred to the House Committee on Energy and Commerce.

119-hres290 119th Congress House
Sponsor
Rep. Fedorchak, Julie [R-ND-At Large] (R), ND
Introduced
2025-04-02
Committees
Energy and Commerce Committee
Latest Action
Referred to the House Committee on Energy and Commerce.

No roll-call vote data available for this bill.

Similar Bills

  • 118-hr5067 — Empowering Electric Grid Reliability Act 25% match 118th Congress
  • 119-hr3843 — Baseload Reliability Protection Act 23% match
  • 118-hr2750 — Enhancing Electric Grid Resilience Act 23% match 118th Congress
  • 117-hr8311 — Grid Resilience Act 20% match 117th Congress
  • 114-s1221 — Bulk-Power System Reliability Impact Statement Act 19% match 114th Congress
Investigate this bill → Beneficiary scoring, topic classification, and fiscal analysis